2010 - Michelin Victoria Floresti - Romania

  „Turn Key” project (advanced design, hydraulic calculations, execution, commissioning and start-up) for the sprinkler installation, alarm and smoke detection, and access control system in accordance with NFPA13 and Romanian latest rules and regulations:

  1.   “Turn Key” project (advanced design, execution, commissioning and start-up) for the sprinkler installation water-water system in accordance with NFPA13 and Romanian latest rules and regulations.
  • „Mixing” Area with a total area of 2.500 m²;
  1.   “Turn Key” project (advanced design, execution, commissioning and start-up) for the alarm and smoke detection installation in accordance with NFPA13 and Romanian latest rules and regulations.
  • “Mixing” Area with a total area of 2.500 m²;
  • „Vaccum” Area with a total area of 3.300 m²;
  1.   “Turn Key” project (advanced design, execution, commissioning and start-up) for water mist extinguishing installation in accordance with NFPA13 and Romanian latest rules and regulations.
  • Pump group from the “Vulcanization” Area.
  1.    “Turn Key” project (advanced design, execution, commissioning and start-up) for access control system in accordance with NFPA13 and Romanian latest rules and regulations.
  • Servers Room.
  1.   Acquisition and site assembly of fire resistance doors and gates.