„Turn Key” project (advanced design, hydraulic calculations, execution, commissioning and start-up) for the sprinkler installation, alarm and smoke detection, and access control system in accordance with NFPA13 and Romanian latest rules and regulations:
- “Turn Key” project (advanced design, execution, commissioning and start-up) for the sprinkler installation water-water system in accordance with NFPA13 and Romanian latest rules and regulations.
- „Mixing” Area with a total area of 2.500 m²;
- “Turn Key” project (advanced design, execution, commissioning and start-up) for the alarm and smoke detection installation in accordance with NFPA13 and Romanian latest rules and regulations.
- “Mixing” Area with a total area of 2.500 m²;
- „Vaccum” Area with a total area of 3.300 m²;
- “Turn Key” project (advanced design, execution, commissioning and start-up) for water mist extinguishing installation in accordance with NFPA13 and Romanian latest rules and regulations.
- Pump group from the “Vulcanization” Area.
- “Turn Key” project (advanced design, execution, commissioning and start-up) for access control system in accordance with NFPA13 and Romanian latest rules and regulations.
- Servers Room.
- Acquisition and site assembly of fire resistance doors and gates.