2020 - TE Connectivity - Germany

„Turn Key” project (advanced design, hydraulic calculations, execution, commissioning and start-up) for the sprinkler and interior hydrants installation in accordance with FM latest rules and regulations for:

  • Warehouse including production, logistic, offices – 12.000 m2: 3 Water-Water system, 2 dry sistems and 3 distributors.
  • Pump station installation – FM diesel pumps
  • Water tank – 650 m3